Atlanta Reservoir No. 2 (Hemphill Reservoir No. 2)

The larger of Atlanta's two Hemphill raw-water reservoirs, holding Chattahoochee water for the Hemphill treatment plant, behind a fence beside a public hill.

Open its history on the map

Aerial photo of Atlanta Reservoir No. 2 (Hemphill Reservoir No. 2), 1940
1940
Aerial photo of Atlanta Reservoir No. 2 (Hemphill Reservoir No. 2), Oct 2023
Oct 2023
Atlanta Reservoir No. 2 (Hemphill Reservoir No. 2) shaded by depth
Depth, modeled
Lidar terrain shading around Atlanta Reservoir No. 2 (Hemphill Reservoir No. 2)
Bare-earth lidar

From the air

This reservoir is already full in the 1949 photo, and the 1940 photo shows the same basin. That is about 20 years older than the 1960 date in the dam inventory. Its outline never changed.

First seen
Already there in the earliest aerial, from 1940. The photos do not show it being built, so they cannot date the build.
Dam in the lidar
Lidar shows a ring embankment with a crest near 980 ft, about 4 ft above the water. On the west side it stands about 62 to 63 ft above its base. It drops to about 26 ft on the north face. The crest is even. No breach or spillway is visible.

Read from aerial photos taken between 1940 and 2026 and from USGS 3DEP lidar, then checked by a second reading. How the photos were read.

Depth

Depth, modeled. Best guess: deepest about 65.9 ft, average about 31.5 ft. The deepest point could be anywhere from 46 ft (Shallow) to 80 ft (Deep). Modeled, not measured: shaped by the shoreline and the dam, and scaled to the dam inventory’s average depth of about 31.5 ft.

Treat it as an estimate; no survey of the lake bottom was found.

How depth is estimated.

History

NID lists this basin at 83 ft high, 31.6 acres and 996 acre-ft, in Satisfactory condition and High hazard. It is off-stream storage: pumps send Chattahoochee water here, and the city says the two reservoirs together hold about 345 million gallons, enough for three to five days of supply. The Hemphill works opened in 1893 with an initial reservoir of about 200 million gallons, and a 1911 report mentions a 'new' 250-million-gallon reservoir, so this basin may date to about 1911. That link is not proven. The city's project page says only one reservoir is inactive and lists embankment repairs to both. The grounds were open to locals until 1996 fencing. 12345

Who built it

Part of the Hemphill water works planned under Mayor William A. Hemphill and built 1891-93 by contractor S. B. Mosby & Co., to designs by Robert M. Clayton and William G. Richards. The original reservoir was about 200 million gallons. When a second basin was added is not established. A November 1911 engineering report gives 178 million gallons in storage plus a new 250-million-gallon reservoir, which could fit a larger second basin built around 1908-1911 (an inference, not confirmed). 6728

Timeline

  1. 1891William A. Hemphill takes office as mayor and pushes a new Chattahoochee-based water system; construction contracts for the system are awarded that year. 78
  2. 1892-1893The Hemphill Avenue works are built, with an initial reservoir of about 200 million gallons on some 55 acres beside old Howell Mill Road, in a park with a summer pavilion. 68
  3. 1908A taller block is added to the pumping station building beside the reservoirs. This concerns the station, not the reservoirs. 610
  4. November 11, 1911Fire and Water Engineering reports 178 million gallons of storage plus a 'new reservoir' of 250 million, for 428 million total. The text does not say this is the second Hemphill basin. 2
  5. Undated, 20th centuryBerkeley Park's history says locals were once allowed to fish the water works lakes and used a bandstand by the lakes for picnics and musical programs. No dates are given. Uncertain 1112
  6. 1996Chain-link fences go up around the reservoirs before the Olympic Games; earlier the grounds had hosted school track meets, proms and community barbecues. 131415
  7. 2018-2022City capital project WS-Hemphill Reservoir Embankment #1 includes embankment erosion and revetment repairs to both reservoirs; scheduled construction July 7 to Nov. 30, 2022; $3.22 million. 3
  8. Late 2020Tunnel work linking the Hemphill treatment plant to the Bellwood Quarry raw-water reservoir (about 2.4 billion gallons) finishes under the city's Water Supply Program, adding emergency raw-water storage. 1617
  9. March 2022The two-acre Hill greenspace opens beside the reservoirs, with fences moved back and views of the water and the city skyline. 181415

Names

Atlanta Reservoir No. 2 / Atlanta Reservoir (Hemphill) #2 Dam
Primary name in the National Inventory of Dams for GA01495; Georgia EPD's June 2025 inventory lists 'Atlanta Reservoir (Hemphill) #2 Dam'. 59
Atlanta City Water Works Reservoir Number One
NID alternate name for this record. USGS NHD also uses this name for the larger basin (about 32.8 acres), so numbering conflicts with the NID primary names. 519
Hemphill Reservoir No. 2
Name used in the city's water-future page, which pairs it with Reservoir No. 1 for a total of five days' supply. 4
Atlanta City Water Works Hemphill Reservoir
Wording used in Urbanize Atlanta and the Upper Westside CID for the reservoir visible from the public hill. 1815
Atlanta Water Works lakes
Neighborhood history: locals were once allowed to fish the lakes, with a bandstand used for picnics and music. 11

The dam

NID: 83 ft high, 31.6 surface acres, 996 acre-ft normal storage, local-government owner, use Water Supply, High hazard, condition Satisfactory; NID year 1960 conflicts with the 1893 origin and the stream is Unknown. Georgia EPD's June 2025 inventory lists it as Class I (state ID 060-003-00006), 83 ft, maximum storage 1,108 (units not stated), owner City of Atlanta. The city's 2018-2022 project scope covers repairs of minor embankment erosion and revetment to both reservoirs. No public contract number found. 593

Year in the inventory
1960
Dam height
83 ft
Surface
31.6 acres
Average depth
about 31.5 ft
Owner type
Local Government

Figures from the U.S. Army Corps of Engineers’ National Inventory of Dams. Its “year” is often a rebuild or survey date, and average depth is storage divided by area.

Around the lake

Water

Off-stream storage filled by pumps from the Chattahoochee raw-water intake. Water goes on to the Hemphill treatment plant, which supplies about 65 percent of Atlanta's drinking water. NID lists the stream as Unknown.

Civil War

Gen. A. P. Stewart's headquarters (Ira R. Foster house), July 16-21, 1864, stood near Howell Mill Road and Bishop Street, about 0.46 km from this point. The state marker from 1956 is reported missing.

Before 1861

Before Berkeley Park was developed from 1921, this land was part of Jesse Wood's farm, which ran to the Atlanta Water Works on the south. Howell Mill Road is the older road named in accounts of the works.

Visiting

Getting there

City-owned utility infrastructure, fenced and closed to the public. The nearby Hill greenspace at Howell Mill Road and 17th Street has been open since March 2022.

What you can see

Visitors can see reservoir water, embankments and the fence line from public streets and from The Hill. The Hemphill Avenue pumping station is part of the operating treatment plant. No spillway or interpretive marker was confirmed.

Look, don’t dig. Parks, cemeteries and preserves are off limits to digging and collecting, and private land needs the owner’s permission to enter.

Open questions

  • When was this basin built, and is it the 'new' 250-million-gallon reservoir of 1911?
  • Are NID's 1960 completion years for both dams a rebuild, a reclassification or an error?
  • Which basin is No. 1 and which No. 2? NID primary names and the city's 180-million-gallon Reservoir #1 point one way; USGS NHD numbers them the other way.
  • Combined capacity is quoted as 345 million gallons (city overview), 428 (1911) and about 510 (NID acre-feet). EPD lists 642 and 1,108 as maximum storage, with no units.
  • Are there engineering drawings or inspection reports for the dam? EPD's public inventory shows Class I but not condition.
  • Is this reservoir currently in service? The city's project page implies only one reservoir is inactive, but no current operations statement was found.
  • Were the grounds open to all Atlantans in the segregation era? No source found.

Know something? Write to hello@historyunderfoot.org. Family papers, photos and deeds often settle these.

Where to look next

On the map

The map’s own entry for this lake, as it reads there.

Atlanta Reservoir No. 2

Also mapped as Atlanta City Water Works Reservoir Number One

Dam completed
1960 (inventory date; some are older)
Dam height
83 ft
Surface
31.6 acres
Average depth
about 31.5 ft (storage ÷ area)
Owner type
Local Government (inventory)
Purpose
Water Supply
County
Fulton County

Figures from the U.S. Army Corps of Engineers’ National Inventory of Dams, record GA01495. Its “year” is often a rebuild or survey date, and average depth is storage divided by area.